Thanks to our generous Fund-A-Need benefactors in 2025, we were able to complete the first phase of renovations to the basement/parish hall in the Flora Ave school building.​
​
This year's Fund-A-Need will go towards Phase 2!
​​​​Phase 1:
Phase 1 Completed :
-
Overhaul of men's restroom, including adding natural light, improved ventilation, and new fixtures.
-
Resizing of women’s restroom, including a more private entrance, additional floor space, cleaning storage, improved ventilation, and new fixtures
-
Test replacement of exterior wood-and-drywall walls with plaster over the foundation walls or concrete block/brick half-walls to control moisture
​​​​Phase 2:
​Future work will begin when funds and manpower are available, and when portions of this work will not interfere with the school:
-
Completion of exterior wall removal/reconfiguration where possible
-
Removal of metal HVAC ducting to improve ceiling height
-
Installation of multiple ductless ceiling-mounted HVAC units to improve cooling and heating
-
Removal or rerouting of electrical conduit, data wires, and plumbing pipes from interior area of room to improve ceiling height and aesthetics
-
Additional storage for the kitchen in the rear hallway
-
Addition of modern acoustic ceiling tiles (wood slat or similar) within recessed ceiling areas
-
Encase concrete beams in wood, or similar finish to improve aesthetics
-
Replacement of vinyl-tile floor with durable, level surface (we are exploring various options at present such as polished concrete, or epoxy-based terrazzo)
![]() Current look at the Flora Hall | ![]() Sketch of Future Plans Courtesy of Fr. Palko | ![]() Digital Rendering of Planned Renovations Courtesy of Fr. Palko | ![]() Digital Rendering of Planned Renovations Courtesy of Fr. Palko |
|---|---|---|---|
![]() Digital Rendering of Planned Renovations Courtesy of Fr. Palko | ![]() Digital Rendering of Planned Renovations Courtesy of Fr. Palko |